Duane Buziak Mortgage Maestro here, with an illustrative example. Suppose you buy a $90,000 lot and budget $260,000 to build, so total cost is $350,000. If the after-completion value (ARV) is $450,000 and a lender advances 80% of cost, capped at 70% of ARV, the loan is the lesser of $280,000 and $315,000, so $280,000. You bring about $70,000 plus closing costs, interest carry and reserves, instead of the full $350,000 an all-cash build would tie up. Illustrative only, not a quote. The percentages are set by each lender and vary by file.
A ground-up construction loan for investors is short-term financing that pays for a new build in stages and is sized as a percentage of project cost and of after-completion value. You supply the rest in cash, plus closing costs and reserves, then exit by selling or refinancing into a rental loan. I’m a mortgage broker, and I shop your loan across multiple wholesale lenders. Before you start, have a lot or a lot contract, a rough budget and an exit in mind (sell or rent).
By Duane Buziak, NMLS #1110647
In this guide
- Step 1: Define the Project and Your Exit Strategy
- Step 2: Check Zoning, Permits and Utilities on the Lot
- Step 3: Build a Line-Item Budget and Draw Schedule
- Step 4: Choose and Vet Your General Contractor
- Step 5: Understand How Ground-Up Loans Are Structured and Compare Your Options
- Step 6: Gather Your Documents and Check Your Own Numbers
- Step 7: Run a Soft Pull Pre-Approval, Then Move to Closing and Draws
- Who This Loan Fits, and What Comes After You Apply (includes the FAQ and Sources)
Step 1: Define the Project and Your Exit Strategy
Decide first whether you are building to sell (a spec build) or building to rent and hold. The exit drives the loan path. A spec build usually pairs a short-term construction loan with a sale as the payoff. A build-to-rent plan usually pairs construction financing with a refinance into a DSCR rental loan, or uses a construction-to-perm product where the loan converts after completion.
Then write a one-page project summary. A lender will want to see the same facts you need to see:
- Lot address and whether you own it or have it under contract
- House plan and square footage
- Target ARV, backed by three to five recent comparable sales of similar new or nearly new homes nearby
- A construction timeline, start to certificate of occupancy
The most common mistake I see is choosing a loan before choosing the exit. If you plan to hold, test the numbers now. Estimate the market rent, subtract taxes, insurance and any association dues, and ask whether the property can support the DSCR a refinance lender will require. DSCR is the property’s rental income divided by its debt payment, and the minimum varies by lender and program, so confirm it with me for your file. A house that appraises well but rents too low can leave you stuck at the end of the build.
If the numbers only work when everything goes right, adjust the plan or the budget now. It costs nothing to change a page of notes.
Step 2: Check Zoning, Permits and Utilities on the Lot
Call or visit the county or city planning office and confirm that zoning allows the structure you plan to build. Ask about setbacks, minimum lot size, height limits and whether a survey or a soil or perc test is required. A lot that looks buildable can fail on drainage, easements or septic suitability.
Next, verify utility access: water, sewer or septic, and power. If utilities must be extended to the lot, the cost belongs in your budget, and the timing belongs in your schedule. Ask the permitting office how long a residential permit currently takes. Every month of delay is another month of interest on the drawn balance, plus taxes and insurance on a lot that produces nothing.
Lenders will generally ask for the following:
- The lot contract or the deed
- Final plans and specifications
- Permit status, either issued or a documented path to issuance
- A survey or soil report where the jurisdiction or lender requires one
Requirements and timelines vary widely by jurisdiction, and some counties are much slower than others. Treat what I list here as a starting point and confirm every item with your local planning and building departments. If you are buying the lot, make your contract contingent on zoning and permit feasibility where the seller will agree, so you are not locked into land you cannot build on.
Step 3: Build a Line-Item Budget and Draw Schedule
Break the construction budget into line items: site work, foundation, framing, roofing, plumbing, electrical and HVAC, insulation and drywall, finishes, landscaping, permits and fees. Add a contingency line. Contingency is a reserve for overruns, such as a price jump on lumber or a rock layer found during excavation. I won’t give you a fixed percentage as a rule, because the right cushion depends on the plan, the site and your builder’s track record. Ask your contractor what they would hold back on a job like yours, and treat a budget with no contingency as incomplete.
Ground-up loans typically release money through a draw schedule rather than in one lump sum. The builder completes a stage, an inspection confirms it, and the lender releases funds for that stage. That means you or your contractor may front some costs before each reimbursement, so you need working capital beyond the down payment.
Holding costs add up while the house is built. Here is an illustrative monthly carry, assuming $140,000 has been drawn at an assumed 10% annual interest-only cost. This is not a quote or a rate offer.
| Principal and interest | Property tax (find your county assessor) | Insurance | PMI if any | Total monthly cost |
|---|---|---|---|---|
| $1,167 interest only ($140,000 x 10% / 12) | $100 (illustrative, lot only) | $150 (builder’s risk, illustrative) | None | $1,417 |
The interest line grows as more is drawn. Builder’s risk insurance covers the structure while it is under construction and differs from a standard landlord policy, so get a quote early.
Step 4: Choose and Vet Your General Contractor
Your builder is a large part of what the lender is underwriting. Collect the following before you commit:
- The contractor’s license, verified directly with the state licensing board rather than from a copy they hand you (in Virginia, that is the Department of Professional and Occupational Regulation)
- Certificates of general liability and workers’ compensation insurance
- Three or more references from recent clients
- A list of completed projects similar in size and price to yours, ideally with addresses you can drive past
- A signed construction contract, either fixed-price or cost-plus
Fixed-price contracts give you a cap on cost, but change orders can still move the number. Cost-plus contracts pass actual costs to you along with a builder fee, so they need tighter budget tracking and a firm contingency.
Lenders typically evaluate builder experience and may ask for it in writing. If you are a first-time builder, do not assume you will get the same terms as an experienced one. Some programs price or structure the loan differently, and some want an experienced general contractor involved. Terms vary by lender and file, which is one reason I compare options across wholesale lenders rather than offering a single menu.
The mistake to avoid is a vague contract. A scope that says “build house per plans” with no line detail, or a payment schedule that does not match the lender’s draw stages, creates disputes and delays. Make the contractor’s payment milestones mirror the draw schedule from Step 3, and make sure the scope, materials allowances and completion date are written down.
Step 5: Understand How Ground-Up Loans Are Structured and Compare Your Options
A few terms decide how much cash you need:
- Loan-to-cost (LTC): the share of total project cost the lender will fund.
- Loan-to-ARV (LTV): the share of the projected after-completion value the lender will fund. Lenders commonly apply both tests and use the lower result.
- Interest-only payments: you pay interest on the drawn balance, with principal due at payoff.
- Term: a short window, built around the construction schedule and any sale or refinance period.
- Lot financing: some programs fund the lot in the same loan, and some count the lot only as your equity. Don’t assume the lot is included.
Terms, percentages and costs vary by lender and by file, so I am not quoting any here. Also, the loan does not fund everything up front. Money moves with the draws.
| Option | Who it fits | Documentation | Credit approach | Down payment |
|---|---|---|---|---|
| Ground-up construction loan | Investors building new on a lot, to sell or to hold | Lot contract or deed, plans, budget, contractor agreement, ARV comps | Reviewed per program; soft pull preview available first | Varies by program and file |
| Fix-and-flip bridge loan | Investors buying an existing property to rehab, not building new | Purchase contract, rehab scope, ARV support | Reviewed per program; soft pull preview available first | Varies by program and file |
| Construction-to-perm | Build-and-hold investors who want one loan that converts after completion | Same as ground-up, plus rental or income support for the permanent phase | Reviewed per program; soft pull preview available first | Varies by program and file |
| Cash-out or DSCR refinance after completion | Investors exiting a finished build into a long-term rental loan | Lease or market rent, appraisal, entity documents | Reviewed per program; soft pull preview available first | Not a purchase; equity and DSCR requirements vary |
Here is how the broker model compares with going to one company directly. Confirm with any company whether it offers ground-up financing in your state, because product menus change.
| Factor | Independent broker | Named company model |
|---|---|---|
| Who funds the loan | I shop your loan across multiple wholesale lenders | A single company funds through its own channels, as with Kiavi, Rocket, Movement, Guild or Angel Oak |
| Product range | Programs from several wholesale lenders, compared for your file | That company’s own program menu and guidelines |
| Your application | One file, matched to a lender after review | One application with that company, evaluated under its guidelines |
Step 6: Gather Your Documents and Check Your Own Numbers
Assemble the file before you apply, because missing items cause most of the delays I see:
- Entity documents if you borrow through an LLC: articles of organization, operating agreement, EIN letter
- Government ID for each guarantor
- Bank and asset statements showing the down payment and reserves
- Track record or builder resume, including prior flips, builds or rentals
- Lot contract or deed, plans, and permit status
- Line-item budget and the signed contractor agreement
- ARV comparable sales
Then add up the cash you will need. That is the down payment, closing costs, and a cushion for interest and for costs you front between draws. Reserves are liquid funds the lender wants to see left over after closing, and the amount depends on the program and your file. Approval depends on the full file, so confirm your numbers with me before you commit to a lot contract.
Check the market around your project too. I have not printed figures here because these releases update on a schedule and a copied number goes stale. Pull the current value for your county, and write down the release date.
| Item | Figure | Source link | As-of date |
|---|---|---|---|
| New residential construction (housing starts, permits) | Pull the latest national and regional release | Census Bureau | Record the release date when you pull it |
| Rental vacancy rate | Pull the latest quarterly figure | Census Bureau | Record the release date when you pull it |
| Fair Market Rent for your target county | Look up your county and bedroom count | HUD User | Record the fiscal year shown |
Fair Market Rent is a government benchmark, not your achievable rent, so use it as a cross-check against your own rent comps.
Step 7: Run a Soft Pull Pre-Approval, Then Move to Closing and Draws
Start with the NoTouch Credit Pull soft pull pre-approval. It previews your loan options without a hard inquiry, so your credit is not touched while you compare. Pre-approval is subject to credit approval and underwriting guidelines. Then call me at 804-212-8663 and we will go through your project summary, budget and exit.
After that, the process usually runs in this order:
- I submit your file to the wholesale lender that best matches your project and profile.
- The lender orders an appraisal based on the as-completed value of your plans.
- Title work and builder’s risk insurance are arranged.
- You close, and the lot purchase or payoff is handled according to the program.
- Construction begins. Inspections confirm each stage, and draws are released.
Timelines depend on the file, the appraisal and how quickly documents come in, so I do not promise dates. Plan your carry costs with some slack.
The exit is the last step of the loan. If you sell, the sale proceeds pay off the balance. If you hold, you refinance into a long-term DSCR rental loan once the property is complete and leased or ready to lease. Start talking about that refinance before you break ground, because rental income and the DSCR are part of the plan.
I am licensed in VA, FL, TN, GA, DC, NC, SC, MD, TX, KY and WV. Confirm that your property is in one of these states before you go further.
Who This Loan Fits, and What Comes After You Apply
This loan fits investors who have a lot or a lot contract, a plan, a vetted builder and cash reserves to carry the project through draws. It does not fit someone with no budget, no builder, or no clear exit. Those gaps are better fixed before an application than during one. Approval always depends on the file, and your options will depend on your lot, plans, experience and reserves.
About my background: I hold 5.0 reviews and 2,000+ verified reviews across all platforms. I was named Scotsman Guide Top Originator in 2025 and 2026, VA Broker of the Year in 2024 and 2025, and earned UWM PRO ELITE in 2025.
Ready to fund your next deal with an award-winning broker who knows investor financing? Preview your loan options with a soft pull that won’t touch your credit, and get tailored fix-and-flip, DSCR, BRRRR or construction financing from a lender for life. Call 804-212-8663. Duane Buziak Mortgage Maestro is ready to review your project.